Work starts on the main walls

The house is starting to look quite cosy now as the insulation is being fixed on to the main walls of the house. A mesh is then fitted onto the outside of the insulation to provide a key for the render.

One of the challenges is fitting the fairly solid and rigid insulation around all the things on the walls. The outside light needed to be removed and the insulation fitted around the cable. The gas meter is on an outside wall so will need to be insulated around. The flue for the gas boiler needs to be extended to accommodate the extra depth of the insulation and then have the insulation fitted around it.

The outlet for our gas boiler needs to be extended to accommodate the depth of the insulation. This is being done by a gas engineer.

Insulating around the boiler outlet

Insulation is attached to the walls of the house

Main insulation

Tags: flueinsulationsolid walls 

Blog post by catherined on July 09, 2008 at 2:23 p.m.